The City of Cedar Hill conducted a Water andWastewater Master Plan Update in 2012. The goals of this Plan were to evaluate the capacity of the existing water and wastewater systems and to recommend a phased Capital Improvements Plan through buildout. With Cedar Hill's projected population growth and commercial development, the recommendations will serve as a basis for the design, construction, and financing of facilities required to meet the City’s water and wastewater service needs. The Plan discusses major elements such as:
Updating the existing hydraulic models
Developing water and wastewater load projections
Elevated Storage Tank Operational Analysis
Identifying system improvements through Buildout
Developing a phased Capital Improvements Plan
Preparing a Water and Wastewater Master Plan Report
The following are the chapters of the Water and Wastewater Master Plan:
Executive Summary
Introduction
Scope of Work
List of Abbreviations
Population
Water Demands
Historical Water Demands
Projected Water Demands
Water System Analysis
Existing Water Distribution System
Water Model Update
TCEQ Requirements
Storage and Pumping recommendations
Water Supply Evaluation
Pressure Evaluation of the Proposed Lower Pressure Plane